1411 results found
Featured results
More results
The Toolkit is intended to provide African countries, in summary form, with an overview of the experience to date with railway concessioning in Sub-Saharan Africa.
It is used to guide the implementation of classification management of the environmental impact assessment of the construction project to prevent adverse impacts on the environment.
GI Hub Senior Director for Legal Frameworks and Procurement Policies Mark Moseley gave a presentation at an APEC Business Dialogue aimed at promoting waste management projects being undertaken as Public-Private Partnerships (PPPs) in Indonesia.
The authors evaluate successes and failures of a private sector reform in the water sector in the early years of reform, they analyse the impacts of the water reform on individual welfare and perform cost-benefit analysis for the reform.
The author evaluates the strength of the effect that community pressure and pollution charges have on industrial pollution control in China, the author finds that the implicit discharge price is at least as high as the explicit price. In other words, community pressure not only exists, but may be as strong an incentive as the pollution charge is for industrial firms to control pollution in China.
PIMAC, which leads the preparation of pre-feasibility studies in Korea, has prepared sector-specific guidelines for the preparation of pre-feasibility studies in accordance with the General Guidelines for Preliminary Feasibility Studies.
Infrastructure projects to carry out environmental impact assessments to prevent adverse impacts on the environment after project implementation.
The International Labour Organization (ILO) has promoted employment-intensive public and community works programmes as a major means of job creation and poverty alleviation in developing countries.
Brabo 1 Light Rail is the first PPP project for public transport in Flanders, Belgium. The project was procured by two Procuring Authorities under two separate contracts.
The Gautrain Rapid Rail Link project is an 80km rail project developed to ease traffic congestion and facilitate travel in the Johannesburg-Pretoria corridor.
The I-495 Express Lanes PPP (generally referred to in North America as P3) project consists of the construction of two additional high-occupancy toll (HOT) lanes.
The Daang Hari-SLEX Link Road, locally known as Muntinlupa-Cavite Expressway, is a 4km 4-lane toll road project.
The Intercity Express Programme project was initiated in 2005, with the Procuring Authority’s business case showing that, at that point in time, trains were only just providing sufficient capacity to meet demand, and that existing trains were approaching the end of their expected service life.
The Port of Miami Tunnel was one of the first public-private partnership (PPP, generally referred to as P3 in North America) projects in the State of Florida.
The Queen Alia International Airport in Jordan was expanded and renovated as part of the Jordanian Government’s efforts to improve tourism and promote Jordan as a travel hub.
The Segarra-Garrigues Irrigation System project is an important project in the development of the Lleida province of Catalonia, Spain.
The Zaragoza Tramway system is 12.8km long, has 25 stops, two inter-modal parking garages and two depots, one of which is used as a main central terminal building.
The Qiaoxi District Central Heating project was procured as the second stage of a two-stage scheme to improve the heating supply in the Qiaoxi District of the Zhangjiakou municipality
The Central Berkshire Waste project is a success story in terms of collaboration, overcoming challenges and the ability to adapt to changes.
The 440/138kV Piracicaba substation is a small facility situated in the inland region of Piracicaba in the state of Sao Paulo, Brazil.