672 results found
Featured results
More results
The IMF/WBG Note presents policy issues related to Islamic finance for consideration by the G20 members.
This report looks at the nature of Variable Renewable Energy (VRE) and the resulting challenges associated with the integration of VRE technologies into a power system. It provides an overview of the measures available to limit and manage these challenges. This report highlights the importance of increased flexibility when integrating high levels of VRE, and focuses on two sets of options to provide such flexibility: natural gas-fired power generation technologies and energy storage.
The use of public-private partnerships to design, build and deliver infrastructure worldwide has grown significantly in the past decade.
The Public-Private Partnership Legal Resource Center (PPPLRC) provides sample legal materials which can assist in the planning, design and legal structuring of any infrastructure project.
The purpose of the report is to help the Government of Armenia: analyze the current levels and structures of water and wastewater tariffs compared to the costs of service, the report covers the cost of Waste and Water Services, the affordability of WSS and alternatives for transitioning to cost-recovery level tariffs over time in Armenia.
The Project Readiness Assessment (PRA) is a standardized tool managed and financed by the Global Infrastructure Facility (GIF).
This technical note provides an overview for authorities who wish to conduct flood hazard and risk assessments and who must develop a step-by-step plan for carrying out the assessment that is appropriate and feasible in the local context.
The study recommends measures and technologies to overcome the existing problems and transform the cities of Amritsar and Ludhiana, the report covers improved storage drainage, improved urban environment and addressing services for the poor.
This paper answers three questions surrounding the reform of water supply services in Abidjan. What motivated reform in a system that was already performing well? How and why did the reform affect sector performance, and what additional changes might improve performance further? And what explains the relatively strong performance of Abidjan's water system?
The purpose of the Guidelines is to establish the types of socioeconomic evaluations that will be applicable to the investment programs and projects considered by the dependencies and entities of the Federal Public Administration.
The purpose of the Guideline is to establish the types of socioeconomic evaluations that are applicable to the mass urban transport investment projects.
The OECD Guidelines for Multinational Enterprises provides recommendations to businesses in the areas of disclosure; human rights; employment and industrial relations; environment; combatting bribery and more.
This toolkit is a resource designed to assist practitioners working on the next generation of PSP contracts for smaller water projects.
The 3PA consists of three pillars each of which represents a key dimension of quality project assessment providing a clear framework within which project proposals can be evaluated.
Practical solutions and models for addressing obstacles to institutional investment in infrastructure in developing countries WBG a note that considers the existing types of institutional investors and their potential for filling the infrastructure financing gap and more.
This report discusses whether public-private partnerships (PPPs) are better than conventional public provision and can ensure proper maintenance, timely expansion, and less congestion.
The study specifically examines whether power system size and coun¬try per capita income can be reliable indicators of initial conditions for guiding policy on power market structure.
The European Investment Bank (EIB) calculates the economic returns of its projects using internationally accepted methods.