283 results found
Featured results
More results
The UAE?s Federal roads network contains a diverse variety and large quantity of assets. Based on this, the MoEI has detected the need of a comprehensive system to manage and operate the maintenance activities with the highest efficiency.
Size: Capacity to produce up to500 KTA of Pure CO2 product (food grade)) Brownfield: Parties involved (public and private): private: Saudi Basic Industries Corporation (SABIC) Relevant contractual details (type (concession, BOT, PPP etc
Cost: total cost for the design and realization of the viaduct amounted to EUR 202 million
The program was initiated to develop industrial city in Sudair to support local investors and to attract international investment and to advance the national industry.
A project that that drastically cuts travel, transportation and freight times from one side of the Alps to the other along the Rhine-Alpine Corridor, one of the busiest freight routes, connecting Northern to Southern Europe.
UAE Ministry of Energy and Infrastructure in collaboration with the University of Sharjah, intended to develop new asphalt binder specifications for the UAE to help mitigate the environmental impacts of climate change by building a climate model and running different Intergovernmental Panel on Climate Change (IPCC) scenarios.
As a part of a Balanced National Development project, the project is planning to build a 174.2km long railway starting from Gimcheon, Gyeongsangbuk-do to Geoje, Gyeongsangnam-do.
It is the second bridge that crosses over to Cádiz from the mainland, after Carranza bridge, and one of the highest bridges in Europe, with a gauge of 69 meters and a total length of 5 kilometres
PPP Construction cost of 50 PPP-projects: 1,3 bn ?; maintenance costs 0,7 bn ?; PPP Size: 1 mio. m2 GFA; new built and renovation projects with one or more schools
Toyama City is now a global role model as a Compact City, but Toyama used to be a typical Japanese city challenged by urban sprawl with an ageing and declining population
Parties involved (public and private) CNEA (public), private only as suppliers and contractors
The Igua?u National Park, created in 1939 by Decree No. 1035, houses the largest remnant of Atlantic forest (seasonal semideciduous) in southern Brazil.
ntil September 2020, the Program of universalization “Light for All” had already served more than three and a half million families, which corresponds to more than sixteen million people benefited from the public service of electricity, the vast majority of which are served with conventional network extension.
The Geostationary Satellite for Defense and Strategic Communications is a valuable asset of Brazilian’s government that promotes digital inclusion by covering all Brazilian’s territory and allowing connectivity for the most further regions of the country
The Public Fishing Terminal (?TPP?) of Manaus was built in 2010 by the National Department of Transport Infrastructure - DNIT, in partnership with the Municipality of Manaus.
The hub was developed by Statistic Canada in collaboration with Infrastructure Canada in 2018
Incheon Bridge is the world?s 5th longest cable-stayed sea crossings. It connects to 2nd and 3rd Kyungin and Seohaean expressway, and as a result shortens the journey time from Seoul metropolitan areas to Incheon Int?l Airport by 40 minutes.
Fukuoka City is one of the most prominent cities in Japan today
To date, 112 IPP projects have been procured from four bidding round windows with further windows expected to be announced in the future
Taiyuan, like most northern cities in China, faces a serious shortage of clean heating and heat sources. Under the double pressure of environmental protection and people's livelihood, the Taiyuan government has adopted a low-cost, low energy consumption, environmental protection, which takes into account environment, peoples? livelihood and safety such as the Gujiao power plant, a long-distance transmission heat supply project using waste disposal heat.