These guidelines, circulated by the MoF in April 2015, promote the orderly implementation of PPP projects by guaranteeing effective performance of contractual obligations by the government, and effectively preventing and controlling fiscal risks.
This guide outlines five steps in the context of achieving a knowledge exchange, (i) Anchor the knowledge exchange, (ii) Define the knowledge exchange, (iii) Design and develop the knowledge exchange, (iv) Implement the knowledge exchange, (v) report the results. Case studies from South America and Africa are discussed with reference to this guide. This is the second edition of the document updated in 2015.
This guide outlines five steps in the context of achieving a knowledge exchange, (i) Anchor the knowledge exchange, (ii) Define the knowledge exchange, (iii) Design and develop the knowledge exchange, (iv) Implement the knowledge exchange, (v) report the results. Case studies from South America and Africa are discussed with reference to this guide. This is the second edition of the document updated in 2015.
This guide outlines five steps in the context of achieving a knowledge exchange, (i) Anchor the knowledge exchange, (ii) Define the knowledge exchange, (iii) Design and develop the knowledge exchange, (iv) Implement the knowledge exchange, (v) report the results. Case studies from South America and Africa are discussed with reference to this guide. This is the second edition of the document updated in 2015.
The main point of this report is to provide quantitative evidence of how improving utility management and more accurately targeting smaller subsidies would free up enough resources to make the needed investments and operate the sector at a lower cost.
The note measures access to water supply and sanitation services in the Kyrgyz Republic. It is representative at the national, rural/urban, and oblast levels. Using survey data we analyze the consumption of water supply and sanitation services at the household level with a focus on access, quality, and expenditures.
The guidance on the identification, selection and prioritisation of projects intends to institutionalise the criteria and process in the identification, selection and more.
The IMF/WBG Note presents policy issues related to Islamic finance for consideration by the G20 members.
This report provides innovative approaches to better understand infrastructure sector performance by focusing on the links between key indicators for private and public utilities, and changes in ownership, regulatory agency governance, and corporate governance, among other dimensions.
This report looks at the nature of Variable Renewable Energy (VRE) and the resulting challenges associated with the integration of VRE technologies into a power system. It provides an overview of the measures available to limit and manage these challenges. This report highlights the importance of increased flexibility when integrating high levels of VRE, and focuses on two sets of options to provide such flexibility: natural gas-fired power generation technologies and energy storage.
The use of public-private partnerships to design, build and deliver infrastructure worldwide has grown significantly in the past decade.
The Public-Private Partnership Legal Resource Center (PPPLRC) provides sample legal materials which can assist in the planning, design and legal structuring of any infrastructure project.
The purpose of the report is to help the Government of Armenia: analyze the current levels and structures of water and wastewater tariffs compared to the costs of service, the report covers the cost of Waste and Water Services, the affordability of WSS and alternatives for transitioning to cost-recovery level tariffs over time in Armenia.
The Project Readiness Assessment (PRA) is a standardized tool managed and financed by the Global Infrastructure Facility (GIF).
This paper examines the impact of the STAR highway in the Philippines on public finance.
The guideline is published for local government entities involved in the preparation of feasibility studies.
This technical note provides an overview for authorities who wish to conduct flood hazard and risk assessments and who must develop a step-by-step plan for carrying out the assessment that is appropriate and feasible in the local context.
This report discusses findings from four case studies of the pre-investment stage in infrastructure projects in Latin America and the Caribbean.
The study recommends measures and technologies to overcome the existing problems and transform the cities of Amritsar and Ludhiana, the report covers improved storage drainage, improved urban environment and addressing services for the poor.